General Maintenance in Fishtown Crossing

Located two detached sections of PVC downspout/ drainage pipe. Reattached PVC pipes where detached and secured connections using 1/2” self drilling screws. Inspected all remaining drainage pipe and installed fasteners where PVC was not already fastened or glued.

Loading...