Investigated reported leak areas and plenum space in office area.
Inspected corresponding roof areas for waterproofing issues.
Located open area of curb flashing local to leak area in center of office.
Repairs made using flashing cement and reinforcing fabric.
Inspected HVAC RTU and roof area above leak.
Cleared HVAC condensation line.
Removed built up dirt in HVAC condensation pan.
Flashed several field seams local to leak areas.
Located area of missing mortar below coping along exterior wall above leak front of office.
Sealed gap/ cracks using M1 Sealant.