Investigated reported leak areas in room 325, hallway linen closet, north hall, and room 307 bathroom.
Cleared ballast stone from corresponding roof areas and hosed down roof while regularly checking leak locations for evidence of water penetration.
Areas thoroughly inspected as roof membrane dried.
Two way breather vent installed over north hall leak location to help dry saturated roofing insulation., Located two punctures in EPDM field membrane local to leak area in room 325.
Located two punctures in EPDM field membrane local to leak area in north hallway. Punctures repair using 9” EPDM flashing and lap sealant., Located two area of open/ damaged penetration flashing at HVAC dunnage local to leak area in linen closet.
Located one area of open flashing local to leak area in room 307 bathroom.
Repairs made using 9” EPDM flashing and lap sealant.